Showing posts with label Project 2016 -- Florida or Bust. Show all posts
Showing posts with label Project 2016 -- Florida or Bust. Show all posts

Sunday, April 3, 2016

Project 2016 -- Florida or Bust: The End!

View from the floatie in the pool.
It is hard to believe that it has been almost 18 months since my last blog. I have been a little busy. It all started with my daughter's wedding and the week we when we rented a house in Florida. If you remember, way back it 2013, I started a blog series called Project 2016 -- Florida or Bust. DH and I were working on various projects to ready the house for sale. After returning from my daughter's wedding and the reveal of the wedding dress, we realized how much we missed Florida and decided to kick it into high gear.

I must apologize that I did not include you, Dear Reader, in my adventures, everything just happened so fast, and there was not any time or energy left for blogging; but let me tell you that when the clock struck midnight on New Years' Eve and 2015 gave way to 2016, the kiss DH gave me was in our new home in Florida. Project 2106: Florida or Bust has ended.

Now on to other things...

Saturday, September 27, 2014

Project 2016 - Revival - Painting Again

I am painting again!! This time it is my beautiful DD's room. She was 12 years old when we moved into the house that we live in now. There were two rooms for her and her brother, one green and blue and one pink. She got the pink. When I say pink -- I don't mean a pale, off white, iced pink...I mean a bright, almost hot pink.

I am not sure that the picture captures the intensity of the pink, but it was somewhat overwhelming and headache inducing for me!

DD left behind her bedding, so I took one of the pillow shams from her animal print comforter set to Lowe's and picked two colors out of it for the walls.
The colors are 2007-10C Coconut Milk and 2007-7C New Haven Clay in an eggshell finish. However, you will not see either of those colors in the picture on the left. That is because, I was not sure that I could cover that pink. So I selected Valspar's High-Hiding Primer as the first coat. It worked great and the pink is completely covered in one coat of this primer. Next week, I will begin painting the colors I selected.

I am really looking forward to having an adult bedroom for my DD and her new husband to stay in when they come for Thanksgiving.

Happy painting!!

Sunday, June 30, 2013

La Ristrutturazione del Bagno è Finita


That's Italian for 'the bathroom renovation is finished'! It sounds so much prettier in Italian just like my 'new' bathroom is so much prettier than the 'old' bathroom.

Painting was easy -- I did it all in one day. I also put the toilet together and fixed the gouge in the tub from when I dropped the tile. A 'field trip' to Bed Bath and Beyond yielded a new, extra-long shower curtain, towels and floor mats. The shower curtain will look better once it has hung for a few days and after a couple of steamy showers takes the wrinkles out. I certainly am glad to be done. I promise, these are the last pictures of this bathroom you will ever see. (However, I do have two more bathrooms that need painting . . . next year.)


Happy . . . sitting down and relaxing and enjoying the rest of the day!

Sunday, June 23, 2013

A Sweating Afternoon

Yes, I know, you are very tired of seeing pictures of my bathroom. But not many more -- hopefully. Today I sweated copper pipes for the first time in 30 years and I didn't set the house on fire! In yesterday's post, I shared with you that I had planned to just get a cheap faucet which clips on with a hex screw and an Allen wrench. Then later, I could hire a plummer to come make the pipe the right size. But after finding out that there is no such thing as a cheap faucet -- and I already knew there was no such thing as a cheap plumber -- I walked out with a Do-It-Yourself-but-don't-burn-down-the-house-pipe-sweating-kit.

The product's name is funny -- Bernz-O-Matic! The kit contains flux, a brush, propane container and torch.
It was easy to connect the torch to the container, just like the propane tank on the grill only not as heavy. The other things that I had to buy was emery fabric to rough up the pipe, a pipe cutter and the copper tubing, threaded nozzle, and connector. One thing that I already had that came in very handy was a pair of fire gloves. The first thing that I did was put the threaded end on the pipe. I can't show pictures of myself sweating the copper pipes as I can't hold solder, the pipe and an I-phone! But the gloves came in handy. The pipe got really hot but I never felt it with the glove on.

After I got that done, I cut the pipe to the measurement I had calculated. The pipe cutter was a little small and hard to tighten down after every turn or two. But I was able to make it easier by using a pair of pliers. I guess my hands are not as strong as they used to be.

What is the saying about measure twice, cut once? My calculations are not as good as they used to be either and I might have done better if I had thought about it first. After I put the connector and pipes together to test the length, realized that a 6 inch faucet did not mean I needed a 6 inch pipe, and I had to remeasure, recalculate and re-cut the pipe.

One other purchase I made ended up being a good idea, too. It is a heat shield that you put up behind your pipe and it protects the area behind it. The guy at Menards told me that I could burn the ceramic tile -- pop them right off the wall. So I thought it was a good idea to get one of those. And after I started to sweat those pipes, I was really glad as I couldn't get an angle that the flame didn't get too close to the tile. I finally got all three joints soldered and the water running.

I finally was able clean my tub. After weeks of demolition, mud and tape, thin-set, grout and caulk -- that was one dirty tub. All in all, I am pretty happy with the results and I think that my $60 purchase was most likely cheaper than a plumber. And you never know when I might want to sweat some more pipes.

Happy sweating!

Saturday, June 22, 2013

Another Long Day in DIY Remodel-land and Too Many Trips to the Hardware Store



Today, I started my day by taking out the rest of the inner parts of the toilet and removed the tank. The toilet has been hard to flush and I decided it was time to replace everything as long as I was fixing up the bathroom. I actually started this task last week, but since I had not actually checked out what kind of insides this toilet had, I assumed it was like the one I changed out last year. Not. So I had to make a trip to the hardware store on Thursday to get more/different parts.

In order to change out all the parts, I had to remove the tank from the bowl. The tank is held on with three long bolts which go through a rubber washer, down through holes in the bowl and are held tight by a nut at the bottom. And here is where my day started going badly. The top of the bolts had a slot for a flat-head screw driver. But as soon as I tried to loosen the first bolt, the top of it started to disintegrate and the bottom of the bolt was corroded so getting it off was not going to be easy. Lots of WD-40; a hacksaw and an hour later, I finally removed the last of the three bolts. Unfortunately, I had planned to reuse the bolts so I made another trip to the hardware store.

Which 2 colors would you pick?
Not too bad on the caulk job!
After returning, it was already noon, and I wanted to get the caulk around the tub done since that takes awhile to cure but still needed a second coat of grout sealer on the tile first. I did that and caulked the tub. I had already purchased paint samples last weekend and put all three colors on the wall around the edge of the tub. I needed to "reflect" on the colors for awhile.

I know you will think that I am silly, but I had already planned to go to the hardware store to buy the shower head and tub faucet trim. Why didn't I get it then? Don't ask me. Off I went to pick out my shower head and tub faucet. I knew that I wanted to use a Price Pfister trim kit. The previous hardware was Price Pfister and I didn't want to have to re-plumb the valve, so I had to find a Price Pfister that I liked. Four hardware stores later, I finally had my trim kit and headed home. It was 4:30 in the afternoon.

Installing the shower head and faucet handle was easy. Everything went according to plan until I realized that the tub faucet was too long for the pipe coming out of the wall and it required a threaded pipe. So back to the hardware store. Again.

My thought was to get a cheap tub faucet for a few dollars and then get a plumber in to put in what I needed. I have done soldering of pipes in the past, but did not have a torch and soldering supplies, so I was thinking that would be a stop gap until I got a plumber later in the year. But after finding out that there is no such thing as a cheap, temporary tub faucet, I came home with a new toy! I did some soldering of copper pipes years ago, but never really had the opportunity again and of course didn't own the equipment -- now I do!

By the time I got home it was 7:00 PM and I had not eaten yet so I decided to throw a couple of steaks on the grill for me and the DH. After dinner, I was too tired to think about burning down the house, so I am putting off finishing the tub faucet until tomorrow. I did clean up the bathroom a bit as I was tired of tripping over tools that I had not put away. I mopped the floor and whipped down the counter top and removed and replaced the caulk in on the counter top.

Tomorrow is another day!

Happy remodeling!


Sunday, June 9, 2013

Tiling a Bathroom is HARD WORK!


I spent a lot of time last week reading about how to tile and watching videos on how to tile. I have done several tile jobs in my life, but never a shower. If I made a mistake with this project, I could be looking at some very expensive water damage, so I wanted to make sure I did it right.

Although, earlier I had measured the walls when I initially bought the tile, since my brother and law did all the work to re-frame the tub, I needed to recheck the numbers and make a final decision on what I wanted to do design-wise. I laid the measuring tape on the floor and lined up the diamond featured tile alternating with plain field tile. I then figured out how small a piece would have to be cut on both sides. One of the things that I learned was to not cut too itty bitty a piece for the corners if you can help it. I lucked out -- big enough.

Using a level, I started by drawing a horizontal line the height of one tile minus 1/8 inch off the bottom of the green-board. This gave me a slight overhang on of tile. I will fill this space with caulk when I am done. According to my calculations, I had to center one tile on the back wall. So I measured 1/2 the distance of the wall, made a mark and using a level, I drew a vertical line (the red line in photo on right). Then I drew two other perpendicular lines on either side of that line between which was one tile wide. This gave me my starting place for my first course of tile.

I am using Ultralite Mortar by Mapei. It is a thin set mortar with an approximately 2 hour pot life. Although the bag gives directions to mix the entire bag at once, I did not see being able to tile the whole thing with all the cutting inside of one day -- much less 2 hours. So, I have been mixing smaller batches. One of the problems that many of the articles I read noted was that Do-It-Yourself-ers like me usually don't get the thin-set mixed thick enough. It has to be peanut butter consistency not mayonnaise consistency. When you have s scoop on your "spoon", it should hang there and not drip off. I made sure that I had everything ready to go BEFORE I mixed the thin-set. This was good because all my preparations and recalculations -- not to mention another last minute trip to Menards to pick up the right sized trowel -- the thin-set would have sat there over two hours by the time I got to it.

About half-way through the day, I realized that the 2 X 6 bull-nosed tile that I got to go around the edge was not going to work. I can't go out to far on the sides, or I would hit the mirror. Taking it into where the original tile left off didn't work either because I would have left me cutting corner pieces that were only 3/4 of an inch wide. Ugh. So that meant if I was going to fix it I had to do it quick before the thin-set dried. I popped off the 18 or 20 tiles that I had placed, scraped off the thin-set and started over. Then, back to Menards I went and exchanged the 2 X 6 for 4 X 4 bull-nosed tiles. Or I should say two Menards, since the first one did not have enough for me.

I started tiling around 12:30 or 1:00 PM and tiled into the evening and got nearly 3/4 of the job done by 8:30. At that point I was finished with my third batch of thin-set and my patience was gone. You could see the design coming together, but the hard cutting was yet to come as I had left the wall with the faucet for last.

I woke up the next morning and felt like I had been hit with a Mack truck -- every muscle in my body was screaming. However, there is no stopping now since I have house guests coming at the beginning of July. I have to get the bathroom done or everyone will be sharing the master bathroom.

I worked out where the pipe for the faucet was going to end up. I had anticipated needing to drill a whole in the middle of a tile and bought a carbide hole cutting bit. I was lucky and won the hole cutting lottery! Both the faucet and handle holes were on the edge of tiles and I was able to cut it out using my tile saw. (Yes, I own my own tile wet saw -- best tool investment I ever made!)

I kept working up the wall and cutting the tiles to fit into the corner. I got up to the design rows and realized that my rows were not matching up to the back wall that I finished the night before. By the last row of the wall, I was off nearly an inch at the top! I looked at the tile and realized that the second box of 4 X 4 bull-nosed tile was slightly wider than the 1st box. Since I was lining my course up with the bull-nosed tile So I took off the top 4 rows and trimmed the nubs off of one side of the bull-nosed tiles to make them a little smaller and narrow the grout line. By the time I got back up to the top, I was even with the back tile. Like I said, my little wet saw is a do-it-yourself-ers best friend.
Nubs
No Nubs!










All in all, I am pretty happy with the job. In two week ends it went from this:

to this:


Now I gotta get rid of that robin's egg blue!

Happy tiling!

Friday, May 24, 2013

Project 2016 -- Florida or Bust: Bathroom Makeover - The Beginning!

This isn't a picture of my work. This is the inspiration for my planned tile job in the guest bathroom shower. I have several sheets of tile left over from my kitchen makeover so I found this design at my local Menards store which features the same size tile. I bought off white ("Biscuit") field tile and the tile with the diamond cut outs as trim. Now if I ever get to the point of installing them, I would be happy.

Unfortunately, something always goes wrong in "Remodel Land". I found that the tile that I was removing was attached with some kind of construction adhesive which meant that the tile was not getting removed very easily. In fact, when I got a little past this point, as I chiseled away at the tile, it was actually removing portions of green board with the tile and I realized that this was not going to be a quick tile job as I was going to have to replace the green board, too.

So, now this is what it looks like. I had to go right down to the studs to make sure that I will get a good end result. My trusty dusty brother-in-law will be arriving next weekend to help me re-install green board.

I have only installed dry wall once about 25 years ago and I do not want to rely on my memory on how to tape and mud joints. If it was any other place other than the shower, I might actually try to do it without experience, but a shower is not the place to earn your stripes. Water damage is not fun.

If my brother-in-law can just get me back to complete walls, I have no problem getting the tile up. After living in Florida where everything is tiled, I must have tiled at least an acre worth of tile in my life time.

Happy demolition!

Sunday, April 28, 2013

Project 2016 -- Florida or Bust: Kitchen Makeover -- The Difference a Little Light Can Make



I got the backsplash done and the kitchen cleaned up. On one of my last trips to Lowe's, I found some battery operated puck lights in the clearance section. It was just the thing to give my kitchen the little extra oomph. Thanks for watching the trip!

Happy Makeover.



                                                                                                                            

Saturday, April 27, 2013

Project 2016 -- Florida or Bust:Kitchen Makeover -- With a Little Help From My Family!


My brother-in-law is the greatest!

As some of you who follow my blog know, I am in the home stretch with my kitchen make over. Counter tops -- check! Cabinets painted -- check! Walls painted -- check! Down to the back splash for this weekend's project and I got a call from my sister who said she and her husband wanted to come over and see for herself what I had done so far. I jokingly said that I would welcome their visit as I could use my BIL's help with the recycled tile backsplash.

Right on schedule, my Sis and BIL showed up. He brought an old shirt with him to work in and as I set the big mesh pieces of tile, he started to cut the little pieces to fill in around the outlets. He turned an ALL DAY job into just a few hours. After almost 40 years as my BIL, he's turning out pretty useful!

I have to say that one of the best purchases I ever made was a small wet saw. I have done several small tile jobs (and the next job on my list is the guest bathroom tile around the tub) and a wet saw makes a HUGE difference on how fast you can get the job done. Renting one is possible, but when I bought it, the saw was on sale for under $150 and it would have cost me $75 to rent one for a day. Now 10 years later, 2 houses, and a few tile jobs later, buying it was a great decision.

One of the things that I wanted was to make sure that all of the outlets were brought out to the level of the tile and had plenty of support behind it. Cutting all the little pieces was tedious work, but will make all the difference in the long run.

Tomorrow, I will grout the tile and that will be it until the next project! I am so glad it is almost over. Now to plan a little get together for my friends and neighbors to break in this new kitchen. What's a new kitchen if you can't share and enjoy it!

Happy Grouting!

Saturday, April 20, 2013

Project 2016 -- Florida or Bust:Kitchen Makeover -- In the Home Stretch


I am nearing the end of my kitchen project. Last weekend and this, I have been painting the walls. I went with three different intensities of the same color. About 40% of the kitchen will be covered with the lightest color and 30% with each of the two darker colors. The colors play well with the cabinet colors and will look great with the recycled glass tiles purchased for the back splash.

I went with a "soft-gloss" for the sheen and "scrubbability". It was an
option which is between a satin and a semi-gloss with Valspar's Ultra Kitchen & Bath paint. This paint is both a low odor and zero VOC (volatile organic compounds). I can vouch that the low odor is true as within 24 hours you couldn't smell new paint in the house.
The paint covered easily in two coats -- even the darkest color.

I put the darkest color on the walls around the refrigerator and the cabinets next to it. The lightest color went on the walls around the window. This made sense to me as the window is large and it would have looked odd to me to have a very dark wall with a big bright hole in the middle. The medium color is on the wall where the stove sits. I like the way the three colors work together in the room to provide some depth.

I am looking forward to being done with this project. I guess I always think that DIY projects will be easier than they reveal themselves to be.

Happy Painting!


Sunday, March 24, 2013

Project 2016 -- Florida or Bust:Kitchen Makeover -- Cabinets Finished





















Yea! Yippee! The cabinets are done! I see a million mistakes but I am going to keep my mouth shut and let others decide if I did a good job or not. I am just relieved to have my kitchen back for a short time. The DH is ecstatic over the microwave's return to it's rightful place and getting the coffee maker out of the dining room. I am going to take a break over the next week through Good Friday and Easter weekend before tearing the kitchen apart in the next phase.

I can't wait to get the entire project done. Remaining on the to do list is repairing and painting walls and trim; and installing glass tile back splash.

And now I can knit more!

Happy Knitting!

Saturday, March 16, 2013

Project 2016 -- Florida or Bust:Kitchen Makeover -- The Difference Glaze Makes


On the left is one of the cabinet doors with only the base paint; and on the right, one with the glaze layer added. On the left: cool, flat, grey; and on the right: warm, glossy, taupe. Wow, what a difference glaze makes!

As I wrote in one of my prior posts, I had to keep reminding myself the painting treatment was a two part process and continue through the cool, flat, grey color with which I was covering my cabinets. But now that I am on the second part of the color steps -- I see my plan coming together.

This step is going much quicker. I started yesterday after dinner at about 8:30 and at this point in time I have finished glazing all of the upper and lower cabinets and started the cabinet doors.

I am planning on beginning the final step of a clear protective coat tomorrow even though I will not have finished glazing the doors. The clear coat takes 12 hours to dry enough to put hardware on the doors, 24 hours for full use and 7 to 10 days to cure. I want to make sure that the cabinets are cured before re-installing the microwave since I removed it on Day One. The DH is missing the microwave -- no hot lunches when he is home alone.

I am beginning to see the light at the end of the tunnel. Although I won't be done by Easter Weekend, I can at least have a working kitchen -- I'll take a short break before I begin painting the walls and trim and install the tile back splash.

Tuesday, March 12, 2013

Project 2016 -- Florida or Bust: Kitchen Makeover - Something is Finally Done!

The counter tops are done!!!

This was an interesting project--and a really hard project. As I have said in a prior post, the instruction video always looks easier than it is in reality. The changes we made before doing the color chips again helped in getting us a better result. And for the most part, the counter tops are gorgeous -- a couple of blips.

The finish is much different than I expected. When we applied the last coat, the product was very thick and gooey. As it hardened, it seemed to chemically bond to the color chip layer. The directions said to wait 48 hours before light use and a week before full use.

I can't wait for when the back splash and the cabinets are done.

Yipee!

Saturday, March 9, 2013

Project 2016 -- Florida or Bust: Kitchen Makeover Day Infinity

I love it when the DH  vacuums
The never-ending-kitchen-make-over continued today. They say there is nothing like experience and after failing miserably two weeks ago with the Countertop Transformations® kit, we tried a second round. We made some changes in our approach to increase the chances of success and I think it worked.

LAST TIME: The video that was supplied emphasized working "quickly". Last time the thought that the adhesive base paint would dry before we got the color chips on, had me in a panic. We worked too quickly and as a result,  did not get the product on thick enough and ran into each other and the counter top smudging it in a few places. We also tried to do each bank of cabinets successively, one right after another which just made the stress level increase as we went from the smallest to the longest counter top.

CHANGES WE MADE: After watching the video again, I saw that we had missed words on the screen that said we had about 20 minutes to apply the color chips. That was more time than I thought we had. This time we decided that we would do the largest counter top first. Then clean up and take a break for a couple of hours. Then go back and do both the two smaller counter tops. This helped us in two ways: We cleaned up the mess from the first application so we were not walking around in all the color chips. It will also allow us more time on the sanding tomorrow as that has a time sensitive window, too.

Happy Sanding!!!